JAWAHARLAL NEHRU NATIONAL SOLAR MISSION (JNNSM)

bullet

Statement of Minister

bullet

Mission document

bullet

Resolution - Jawaharlal Nehru National Solar Mission

bullet

Minister's Message on Jawaharlal Nehru National Solar Mission Guidelines for Off-grid and Decentralized
Solar Application and Rooftop and other Small Solar Power Plants

bullet

Formats for submission of project proposal for SPV systems under Off Grid Solar applications

        1.    Mini - Grid SPV Power Plants (Maximum SPV Capacity: 250 kWp each)

        2.    Format for Submitting Project Proposals for installation of Individual SPV Systems

                                                                                             ( Maximum SPV system capacity each :  1kWp)  

(Maximum SPV Water Pumping System capacity each  : 5 kWp)

 

        3.    Stand Alone SPV Power Plants (Maximum SPV Capacity: 100 kWp each)  

 

                4.    Submission of proposal for installation of solar thermal systems/ devices  ( w.e.f. 01.04.2011)

          

bullet

Solar Radiation Resource Assessment (SRRA) Data

bullet

Issue of Concessional Customs Duty and Excise Duty Exemption Certificate for grid connected Solar Thermal and Photovoltaic Power Generation Projects – submission of consumption norms of the items/components/ machinery, reg.

bullet

Amendment in MNRE's OMs dated 1/4/10 & 3/6/2010 regarding issue of Concessional Customs Duty Certificate on items imported  for Solar Thermal and Photo Voltaic Power generation projects  (Posted on 21.02.2011)

bullet

Issue of Concessional Custom Duty Certificate (CCDC) on items imported for Solar Thermal and Photovoltaic Power Generation Projects - Procedures

bullet

Intimation/confirmation about utilization of materials/components and parts procured from various Manufacturers/suppliers by the Solar power project developers under MNRE Certificates (CCDC/EDEC), after commissioning of the solar power projects.

bullet

Issue of Certificate for exemption of Excise Duty on items manufactured for grid connected Solar Thermal and Photovoltaic Power Generation Projects – procedure, reg.

bullet

Clarification reg. - Excise Duty Exemption for procurement of "Transmission Equipment" for initial setting up of a Solar Power Generation Project (Posted on 22/12/2011)

bullet

Jawaharlal Nehru National Solar Mission Guidelines for Selection of New Grid Connected Solar Power Projects, Batch II, Phase-I  (Posted on 24/08/2011)

bullet

Jawaharlal Nehru National Solar Mission Guidelines for Selection of New Grid Connected
Solar Power Projects
(Released on 25/07/2010)

bullet

Jawaharlal Nehru National Solar Mission Guidelines for Off-grid and Decentralized Solar Applications
and Rooftop and other Small Solar Power Plants
(Released on 16/06/2010)

        Additions/Amendments to the ongoing scheme on Off-Grid and Decentralized Solar Applications (Posted on 30.11.2010)

bullet

List of Off-grid Solar Projects Sanctioned under JNNSM as on 31.08.2010  (Posted on 07.09.2010)

bullet

Capital Subsidy-cum-Refinance Scheme for Installation of Solar Off-grid  (Posted on 15.11.2010)

bullet

Accreditation of Channel Partners under Off Grid and Decentralized Solar Applications  (Posted on 18.01.2011)

bullet

Revised Capital Subsidy and benchmark cost of the SPV system w.e.f. 01.04.2011  (Posted on 07.02.2011)

bullet

Reserve Bank of India - Guidelines on Base Rate dated 21.02.2011  (Posted on 22.01.2011)

bullet

Minutes of the meeting held on 3.2.2011 to discuss the standards for components of SPV systems and power plants to be deployed under the Off-grid Solar Applications Scheme in JNNSM  (Posted on 04.03.2011)

bullet

Details of Projects sanctioned during 2010-11 under Off Grid Solar applications of JNNSM  (Posted on 21.04.2011)

bullet

Payment Security Mechanism for Grid Connected Solar Power Projects under Phase 1 of JNNSM (Posted on 20.06.2011)

bullet

List of channel partners accredited by the Ministry for Off-Grid and Decentralized Solar Applications under JNNSM  (as on 16.01.2012)

bullet

Instruction to Channel Partners for not using  the Government Logo

bullet

MW size Grid Solar Power Plants in India  (as on 30th November, 2011)

bullet

Performance of Grid Solar Plants under Demonstration Programme  (Posted on 01.08.2011)

bullet

Minimum Technical Requirements for Installation of Solar Water Heating Systems in field  (Last updated on 29.11.2011)

bullet

Change of subsidy limit of Grading Fee (Posted on 30.09.2011)

       

        ADDENDUM

Jawaharlal Nehru National Solar Mission - Guidelines for Off-grid and Decentralized Solar
Applications - Minimal Technical Requirements/Standards - addendum, reg.

bullet

Programme on “Off-grid and Decentralized Solar Applications” for first phase of the Jawaharlal Nehru National
Solar Mission (JNNSM) till 31st March, 2013, during 2011-12
 (Posted on 26.05.2011)

bullet

Implementation of a Payment Security Scheme (PSS) for Grid  connected Solar Power projects under Phase I of Jawaharlal Nehru National Solar Mission (JNNSM) during the year 2011-12  (Posted on 01.07.2011)

bullet

Environment Clearance for setting up of Solar Thermal Power Plants under JNNSM - Applicability of EIA Notification, 2006  (Posted on 01.07.2011)
 

bullet
bullet

List of Manufacturers empanelled under Refinancing scheme implemented through NABARD as on 31.01.2012

bullet

Guidelines for Migration of Existing Under Development Grid Connected Solar Projects from
Existing Arrangements to the Jawaharlal Nehru National Solar Mission (JNNSM)

bullet

FAQ : Off-grid Solar Applications

bullet

"NVVN issued RFS for New Grid Solar Power Projects"

bullet

Indian Renewable Energy Development Agency Limited (IREDA)

bullet

NTPC Vidyut Vyapar Nigam Limited (NVVN)

bullet

Solar Energy Conclave 2010 - Presentation

bullet

Documentary on Prathama Solar Jyothi  (Posted on 18.02.2011)