Programme/ Scheme wise Physical Progress in 2014-15 (During the month of February, 2015)
Sector FY- 2014-15 Cumulative
Achievements
Target  Achievement  (as on 28.02.2015)
I.   GRID-INTERACTIVE POWER (CAPACITIES IN MW)
Wind Power 2000.00 1512.80 22644.63
Small Hydro Power 250.00 221.60 4025.35
Biomass Power & Gasification 100.00 0.00 1365.20
Bagasse Cogeneration 300.00 170.00 2818.35
Waste to Power 20.00 8.50 115.08
Solar Power 1100.00 750.77 3382.78
Total 3770.00 2663.67 34351.39
II.  OFF-GRID/ CAPTIVE POWER    (CAPACITIES IN MWEQ)
Waste to Energy                    10.00 10.54 143.27
Biomass(non-bagasse) Cogeneration 80.00 46.47 578.29
Biomass Gasifiers   
-Rural    
-Industrial                                     
0.80 0.75 18.56
8.00 6.20 153.40
Aero-Genrators/Hybrid systems 0.50 0.22 2.48
SPV Systems  60.00 52.77 227.12
Water mills/micro hydel 4.00 2.00 15.21
Bio-gas based energy system 0.00 0.30 4.07
Total 163.30 119.25 1142.40
III.  OTHER RENEWABLE ENERGY SYSTEMS
Family Biogas Plants (numbers in lakh) 1.10 0.45 47.98
Solar Water Heating – Coll. Areas(million m2) 0.50 0.66 8.76