Physical Progress (Achievements)

Ministry of New & Renewable Energy

Programme/ Scheme wise Physical Progress in 2014-15 (During the month of March, 2015)
Sector FY- 2014-15 Cumulative
Achievements
Target  Achievement  (as on 31.03.2015)
I.   GRID-INTERACTIVE POWER (CAPACITIES IN MW)
Wind Power 2000.00 2312.00 23444.00
Small Hydro Power 250.00 251.61 4055.36
Biomass Power & Gasification 100.00 45.00 1410.20
Bagasse Cogeneration 300.00 360.00 3008.35
Waste to Power 20.00 8.50 115.08
Solar Power 1100.00 1112.07 3743.97
Total 3770.00 4089.18 35776.96
II.  OFF-GRID/ CAPTIVE POWER    (CAPACITIES IN MWEQ)
Waste to Energy                    10.00 21.78 154.47
Biomass(non-bagasse) Cogeneration 80.00 60.05 591.87
Biomass Gasifiers   
-Rural    
-Industrial                                     
0.80 0.61 17.95
8.00 6.15 152.05
Aero-Genrators/Hybrid systems 0.50 0.27 2.53
SPV Systems  60.00 60.00* 234.35
Water mills/micro hydel 4.00 4.00 17.21
Bio-gas based energy system 0.00 0.30 4.07
Total 163.30 93.16 1174.50
III.  OTHER RENEWABLE ENERGY SYSTEMS
Family Biogas Plants (numbers in lakh) 1.10 0.65 48.18
Solar Water Heating – Coll. Areas(million m2) 0.50 0.72 8.82

 * Progress from some states is awaited.