Physical Progress (Achievements)

Ministry of New & Renewable Energy
Programme/ Scheme wise Physical Progress in 2014-15 (During the month of December)
Sector FY- 2014-15 Cumulative
Achievements
Target  Achievement  (as on 31.12.2014)
I.   GRID-INTERACTIVE POWER (CAPACITIES IN MW)
Wind Power 2000.00 1333.20 22465.03
Small Hydro Power 250.00 187.22 3990.83
Biomass Power & Gasification 100.00 0.00 1365.20
Bagasse Cogeneration 300.00 152.00 2800.35
Waste to Power 20.00 1.00 107.58
Solar Power 1100.00 430.67 3062.68
Total 3770.00 2104.09 33791.74
II.  OFF-GRID/ CAPTIVE POWER    (CAPACITIES IN MWEQ)
Waste to Energy                    10.00 8.54 141.27
Biomass(non-bagasse) Cogeneration 80.00 34.32 561.64
Biomass Gasifiers   
-Rural    
-Industrial                                     
0.80 0.75 18.23
8.00 6.20 153.40
Aero-Genrators/Hybrid systems 0.50 0.13 2.38
SPV Systems  60.00 52.77 227.12
Water mills/micro hydel 4.00 2.00 15.21
Bio-gas based energy system 0.00 0.30 4.07
Total 163.30 105.01 1123.32
III.  OTHER RENEWABLE ENERGY SYSTEMS
Family Biogas Plants (numbers in lakh) 1.10 0.42 47.95
Solar Water Heating – Coll. Areas(million m2) 0.50 0.53 8.63